
This article will introduce in detail how to design an energy storage cabinet device, and focus on how to integrate key components such as PCS (power conversion system), EMS (energy management system), lithium battery, BMS (battery management system), STS (static transfer switch), PCC (electrical connection control) and MPPT (maximum power point tracking) to ensure efficient, safe and reliable operation of the system. [pdf]

● 4000W pure sine wave inverter for home use, high efficiency and stable, output frequency 50Hz/60Hz. ● Auto power inverter recognizes 12/24/48V voltage, intelligent adaptation, easy to operate. ● Peak power of 8000 watt, support the stable operation of high-power home appliances. ● 24V to 220V high efficiency conversion, the highest efficiency of 90%, energy saving and environmental protection, reduce electricity costs. [pdf]

The "4S" in a 4s lipo battery signifies that the battery pack consists of four individual Lithium Polymer lipo battery cells connected in series.Each of these cells has a nominal voltage of approximately 3.7 volts.When connected in series, their voltages combine, resulting in a total nominal voltage of 14.8V (4 x 3.7V).This is a significant jump from the more common 3s battery, which has a nominal voltage of 11.1V, or a basic lipo battery 3.7 v. [pdf]

The HC1000W series is a water-cooled high-voltage inverter designed for ultra-high power loads, which can achieve a strong output of up to 60MW, and at the same time integrates long-life components with redundant fault-tolerant technology, adopts thin film capacitors, low voltage ride-through and other designs to comprehensively improve reliability, and can provide reliable high-voltage variable frequency drive solutions for equipment in the range of 5-60MW to ensure stable operation of loads for more than 30 years. [pdf]

The two battery storage facilities installed in Tonga are complementary: the aim of the first 5 MWh / 10 MW battery is to improve the electricity grid’s stability (regulating the voltage and frequency), while the second 23 MWh / 7 MW battery is designed to transfer the electrical load in order to help the grid supply electricity at peak times, and notably in the evening. [pdf]
We are committed to excellence in solar power plants and energy storage solutions.
With complete control over our manufacturing process, we ensure the highest quality standards in every solar system and energy storage cabinet we deliver.